
Novi Sad's new Danube bridge reaches its main-structure joining stage
On June 18, the main structure of the new Danube bridge near Petrovaradin was joined on the Fruskogorski Corridor. 021 notes that the bridge with approaches is about 1.7 km long, the central span is 505.75 m, and completion that had been announced for the second half of 2026 is now effectively slipping.

