Belgrade today: closures, transport, water, and power
A daily Belgrade service status page for closures and road works, public transport changes, water outages, and planned power works. We show confirmed city and utility notices, while local signals are marked as needs check. Before travelling or planning around utilities, check the district, routes, active period, last check time, and source link.
Coverage: we show confirmed city notices and local signals that can be checked at the source. Zero counts mean no publishable item was found in checked sources; smaller address-level incidents may appear separately at utility services.
Update map
See where closures, works, and outages are active today.
1 active events do not have exact coordinates yet; they stay in the list below.
Go to event listImportant now
Checked through the day
- High priority
Transport change: routes 60, 9A
Active from 09.06.2026 to 02.09.2027. Official BG Prevoz notice affects routes 60, 9A: Информација о промени режима рада линија јавног превоза током извођења нове фазе радова у зони улице Земунски пут.
Zemun - High priority
Transport change: routes 33, 48, 58, 96
Active from 21.04.2026 to 10.02.2027. Official BG Prevoz notice affects routes 33, 48, 58, 96: Информација о промени режима рада линија јавног превоза током извођења радова на изградњи тунелске везе од улице Карађорђева до Дунавске падине – Фаза 1.
- High priority
Transport change: routes 7, 9, 78, 83, 7л, 9A, 9л
Active from 02.11.2024 to 02.09.2027. Official BG Prevoz notice affects routes 7, 9, 78, 83, 7л, 9A, 9л: Информација о промени режима саобраћаја и режима рада линија јавног превоза током извођења радова на уклањању Старог савског моста.
Transport
8 / 8
- DetailsNowConfirmed
Routes 9A and 89 change because of works in Jurija Gagarina Street through March 31, 2027
GSP Beograd says works in Jurija Gagarina Street run from August 29, 2026 through March 31, 2027.
- DetailsCheckingNeeds check
Routes 80, 87 and 87A change because of works in Obalskih radnika Street; no end date is stated
GSP Beograd says the changes caused by works in Obalskih radnika Street, which began June 24, continue until further notice. The page gives no end date; check the official route before travelling.
- DetailsNowConfirmed
Seventeen suburban routes in Mladenovac are changed because of a sidewalk collapse on Kosmajska
BG Prevoz says that because of a sidewalk collapse on Kosmajska in Mladenovac, routes 4101, 4102, 4105, 4106, 4111, 4112, 4112A, 4112B, 4113, 4113A, 4113B, 4113V, 4121, 4121A, 4195, 41021, and 41022 run from the Mladenovac bus station via Brace Badzak before rejoining their usual paths.
- DetailsNowConfirmed
Transport change: routes 60, 9A
Active from 09.06.2026 to 02.09.2027. Official BG Prevoz notice affects routes 60, 9A: Информација о промени режима рада линија јавног превоза током извођења нове фазе радова у зони улице Земунски пут.
- DetailsNowConfirmed
Transport change: routes 33, 48, 58, 96
Active from 21.04.2026 to 10.02.2027. Official BG Prevoz notice affects routes 33, 48, 58, 96: Информација о промени режима рада линија јавног превоза током извођења радова на изградњи тунелске везе од улице Карађорђева до Дунавске падине – Фаза 1.
- DetailsNowConfirmed
Transport change: routes 36, 51, 511, 601, 581Н, 860Н
Active from 20.12.2024 to 31.12.2026. Official BG Prevoz notice affects routes 36, 51, 511, 601, 581Н, 860Н: Информација о укидању стајалишта „Савски трг (Савска)“ током извођења радова на реконструкцији зграде Поште у улици Савска.
Closures
0 / 0
Checked sources have no confirmed closures.
Water
1 / 1
- DetailsCheckingNeeds check
Water supply disruptions are possible in several Belgrade areas during network reconstruction
BVK reports ongoing network works in Vračar, Voždovac, Zvezdara, Palilula, Čukarica and Rakovica. Failures and disruptions are possible in the listed and nearby streets; specific outages will be announced separately.
Power
0 / 0
Checked sources have no confirmed power works to publish.
Checked: Sep 02, 05:05 AM. The summary updates after source checks.