CardLocal

After the Faculty of Mechanical Engineering water-main break, supply restored to Stari grad and Palilula

BelgradeTransportStari grad / Palilula
June 28, 2026, 11:10 AMUpdated: June 28, 2026, 11:10 AM

BVK said that after repair of the pipe break near the Faculty of Mechanical Engineering at midnight, all consumers in Stari grad and Palilula again had water. Crews remain on site, the trench is being repaired and tram tracks are to be cleaned, so trams 5 and 2L are still not running on that route.

Repairs after the water-main break in Kraljice Marije Street
Photo: N1, article on water-supply stabilization after the Kraljice Marije Street break.

Breakdown by publication

How sources frame this story

Sources in this card: 2

Mobile shows the first 2; the full breakdown is available on desktop.

N1

Kraljice Marije Street break repaired: water supply stabilized around 23:00

N1 reports that a pipe in Kraljice Marije Street burst early on Saturday and that Stari grad residents got water around 23:00. According to N1's report, Beogradski vodovod i kanalizacija crews remained on site repairing damage after the break.

Read source
Danas

All consumers in Palilula and Stari grad got water

Danas, citing BVK and RTS, writes that after the pipe repair near the Faculty of Mechanical Engineering at midnight, all consumers in Stari grad and Palilula got water. Crews are continuing trench repairs, after which tram tracks are to be cleaned. Trams 5 and 2L are still not running on that route; the pipe near the Faculty of Mechanical Engineering in Kraljice Marije Street burst on Saturday morning.

Read source