Card

After the Faculty of Mechanical Engineering water-main break, supply restored to Stari grad and Palilula

BVK said that after repair of the pipe break near the Faculty of Mechanical Engineering at midnight, all consumers in Stari grad and Palilula again had water. Crews remain on site, the trench is being repaired and tram tracks are to be cleaned, so trams 5 and 2L are still not running on that route.

LocalBelgradeTransportBelgradeStari grad / Palilula
Publication

Published: June 28, 2026 at 11:10 AM

Updated: June 28, 2026 at 11:10 AM

Related issue

This card belongs to the issue for June 28, 2026.

Open issue
Context

No separate context story has been assigned to this card yet.

Reference

No reference note has been assigned to this card yet.

Repairs after the water-main break in Kraljice Marije Street
Photo: N1, article on water-supply stabilization after the Kraljice Marije Street break.

Sources

Breakdown by publication

Sources in this card: 2
N1
National mediaIndependent

Kraljice Marije Street break repaired: water supply stabilized around 23:00

(Saniran kvar u Ulici kraljice Marije: Vodosnabdevanje stabilizovano oko 23h)

N1 reports that a pipe in Kraljice Marije Street burst early on Saturday and that Stari grad residents got water around 23:00. According to N1's report, Beogradski vodovod i kanalizacija crews remained on site repairing damage after the break.

Read source
Danas
National mediaIndependent

All consumers in Palilula and Stari grad got water

(Svi potrošači na Paliluli i Starom gradu dobili vodu)

Danas, citing BVK and RTS, writes that after the pipe repair near the Faculty of Mechanical Engineering at midnight, all consumers in Stari grad and Palilula got water. Crews are continuing trench repairs, after which tram tracks are to be cleaned. Trams 5 and 2L are still not running on that route; the pipe near the Faculty of Mechanical Engineering in Kraljice Marije Street burst on Saturday morning.

Read source